1. Home
  2. Bills
  3. H.R. 11706

H.R. 11706 · 86th Congress · 1959–1960

To authorize an . extension,. of time for final proof under the desert land laws under certain conditions

H.R. 11706 in the 86th Congress (1959–1960) became law — introduced in 1960, sponsored by Dalip Saund.

During the 86th Congress (1959–1960), Dwight D. Eisenhower was president, and Democrats held majorities in both the House and Senate.

Status
Became law
Introduced
1960
Policy area
Public lands

Sponsor

Dalip Saund (D-CA)

Where it stands

  • Introduced1960
  • Passed the HouseYes
  • Passed the SenateYes
  • Sent to the PresidentYes
  • Became lawYes

More bills from Dalip Saund in the 86th Congress

Other Public lands bills in the 86th Congress

More

From the Congressional Bills Project (Adler and Wilkerson), covering 1947–2002.

Open the interactive version ›